Quality Assurance & Testing
Every cabinet. Every connection. Every signal. Tested, verified, documented.
300+
Units / Month
1 Week
Typical Lead Time
100%
FAT Coverage
25+
Years Track Record
ISO 9001:2015 Certified
Our quality management system covers every stage from design review to final inspection.
Design Review
Every project undergoes formal design review with customer approval before production begins. Schematic review, BOM verification, and thermal calculation included.
Incoming Inspection
All components (Siemens, ABB, Schneider) verified against purchase orders. Certificate of conformity checked. Anti-counterfeit prevention process in place.
In-Process Quality
Wire routing inspection, torque verification on every terminal, point-to-point wiring check. Photo documentation at each assembly stage ensures traceability.
Final Inspection
100% Factory Acceptance Test (FAT) before shipping. Full functional test report and inspection certificate included with every shipment.
Factory Acceptance Test — 100% Coverage
No cabinet leaves our factory without passing a comprehensive 7-step FAT process.
Visual Inspection
Check panel layout, labeling, wire markers, component placement against approved drawings
Insulation Resistance
Megger test at 500V/1000V DC, verify insulation > 100MΩ
Continuity Test
Verify all PE connections, grounding continuity, protective circuit integrity
Functional Test
Power-on test, PLC program download, I/O point verification, PROFINET/Modbus communication
Interlock Test
Safety interlocks, emergency stop circuits, door switches, phase sequence verification
Hi-Pot Test
Dielectric withstand voltage test (2x rated voltage + 1000V for 1 minute)
Documentation
As-built drawings, test reports, FAT certificate, component manuals, spare parts list
Professional Testing Equipment
Insulation Resistance Tester
Megger 500V/1000V/2500V, accuracy ±5%
Hi-Pot Tester
AC/DC withstand voltage, 0-5kV, leakage < 10mA
Earth Resistance Tester
4-wire method, 0-2000Ω
Power Quality Analyzer
Voltage, current, harmonics, power factor
Thermal Imaging Camera
Hot-spot detection during load testing
Network Analyzer
PROFINET/Ethernet cable certification
300 Units/Month. 1-Week Delivery.
Our 5,000 m² production facility is equipped with CNC punching, bending, and wire processing equipment. Modular assembly lines enable parallel production of multiple projects simultaneously.
A dedicated testing bay with full instrumentation ensures every panel undergoes thorough testing before shipping. Climate-controlled storage protects sensitive components throughout the manufacturing process.
Order confirmation & design review
Component procurement & incoming inspection
Panel assembly & wiring
Testing & Factory Acceptance Test
Documentation, packaging & shipping
Certifications & Standards
Our Quality Promise
24-Month Warranty
Full warranty on all panels and components from date of commissioning. Free replacement of defective parts.
Technical Support
Remote troubleshooting within 4 hours, on-site support within 48 hours for major markets worldwide.
Spare Parts Availability
Recommended spare parts list provided with every order. Guaranteed availability for 10 years.
Request a Sample FAT Report
See our testing process in detail. Contact us for a sample Factory Acceptance Test report.
Request Report