Project Overview

Project Background & Objectives

A growing manufacturing company in Vietnam's Binh Duong province engaged SENTRADO to upgrade the control system on their primary production line, which had been running on a legacy PLC platform for over 12 years. The old system used proprietary communication protocols that could not integrate with the company's new manufacturing execution system (MES), preventing real-time production monitoring, quality tracking, and overall equipment effectiveness (OEE) analysis.

The production line performs automated assembly, testing, and packaging of consumer electronics components, with cycle times measured in seconds. The legacy controller, while functional, lacked the processing power for the advanced motion control required by a new high-speed handling system, and its proprietary network made it impossible to connect barcode scanners, vision systems, and other smart devices needed for Industry 4.0 capabilities.

SENTRADO delivered a complete control system migration to Siemens S7-1200 controllers with a PROFINET network backbone, enabling seamless integration with the MES, new motion control hardware, and a comprehensive HMI/SCADA system for production visibility. The migration was completed during a planned two-week production shutdown with all systems validated before resuming full output.

Customer Challenge

Problems We Had to Solve

1. Protocol Incompatibility

The legacy PLC used a proprietary serial protocol that could not communicate with modern industrial networks. The MES integration required OPC UA connectivity, and the new vision system and barcode scanners only supported PROFINET and EtherNet/IP.

2. Motion Control Requirements

A new high-speed pick-and-place system required precise multi-axis motion coordination with microsecond-level synchronization, beyond the capability of the legacy controller. The client needed PROFINET IRT (isochronous real-time) for deterministic motion control.

3. Minimal Shutdown Window

The production line operates six days a week with high utilization. The client could only afford a two-week shutdown for the complete migration, including installation, wiring, programming verification, and production validation.

4. Product Tracking Gaps

Without barcode-based tracking, the plant could not trace individual units through the assembly process. Quality issues were only detected at final test, making it difficult to identify the root cause of defects or implement corrective actions.

5. OEE Visibility

The plant manager had no automated way to calculate OEE. Downtime reasons, changeover times, and production counts were recorded manually on paper, leading to inaccurate and delayed performance reporting.

SENTRADO Solution

Our Approach & System Architecture

SENTRADO replaced the legacy control system with a Siemens S7-1200 platform using a CPU 1215C as the main controller, connected via a PROFINET IRT network to distributed I/O, servo drives, HMI panels, and third-party devices. The PROFINET IRT network provides the deterministic communication required for synchronized multi-axis motion control, with cycle times under 1 millisecond for the motion coordination between the pick-and-place axes.

An OPC UA server embedded in the S7-1200 provides a standardized, secure data interface to the MES, transmitting production counts, cycle times, quality results, downtime events, and OEE metrics in real time. Barcode scanners at each station read unit identifiers and pass them to the PLC, which tracks each product through the assembly sequence and records process parameters and test results against that serial number in a local data log.

The HMI system includes two SIMATIC Comfort Panels at operator stations plus a WinCC RT Advanced SCADA workstation for the production supervisor. The SCADA provides real-time OEE dashboards, Pareto charts for downtime analysis, production scheduling, and quality trend charts. The control panels were manufactured at SENTRADO's facility with all VFDs, servo drives, and power distribution pre-wired and tested, minimizing on-site installation time during the two-week shutdown window.

System Architecture Highlights

  • Siemens S7-1200 CPU 1215C with PROFINET IRT
  • PROFINET IRT network for deterministic multi-axis motion
  • OPC UA server for standardized MES integration
  • Barcode-based product tracking at every assembly station
  • V90 servo drives with SINAMICS for pick-and-place motion
  • WinCC SCADA with real-time OEE dashboards
  • Pre-wired panels for rapid installation during shutdown
  • Vision system integration via PROFINET
Technical Specifications

System Parameters & Configuration

Control SystemSiemens SIMATIC S7-1200
Controller1 × CPU 1215C DC/DC/DC
Total I/O Points280+ (AI: 24, AO: 8, DI: 160, DO: 88)
Motion Axes4 × servo axes (PROFINET IRT)
Communication ProtocolPROFINET IRT / OPC UA / Modbus TCP
HMI Panels2 × TP700 Comfort + 1 SCADA workstation
Control Cabinets2 × IP54
Servo Drives4 × SINAMICS V90 (1.5kW)
Cycle Time8 seconds (reduced from 14 seconds)
MES InterfaceOPC UA with encrypted connection
Product TrackingBarcode at 6 stations
OEE MonitoringReal-time automated calculation
Equipment Used

Key Components & Hardware

Siemens CPU 1215C

6ES7215-1AG40-0XB0

Main line controller

SINAMICS V90 Servo

6SL3210-5FB10-1UF0

PROFINET servo drive

SIMOTICS S-1FL6

1FL6042-2AF21-1AA1

Servo motor for pick-and-place

TP700 Comfort HMI

6AV2124-0GC01-0AX0

Operator touch panel

WinCC RT Advanced

6AV2104-0DA06-0AA0

SCADA with OEE option

SCALANCE XC208

6GK5208-0BA00-2AC2

PROFINET IRT switch

SITOP PSU6200

6EP3333-7SB00-0AX0

24V/10A stabilized power supply

SIRIUS 3RT2 Contactor

3RT2025-1BB40

Motor contactor with auxiliary contacts

Implementation Timeline

Project Phases

Design & Programming

6 weeks

Hardware spec, software development before shutdown

Panel Manufacturing

3 weeks

Pre-wired panels fully tested at SENTRADO

Pre-Shutdown Preparation

2 weeks

Cable trays, network infrastructure, MES setup

Shutdown Week 1

1 week

Remove old system, install new panels, wiring

Shutdown Week 2

1 week

Power-on, I/O checks, dry runs, production validation

Post-Startup Support

4 weeks

On-site engineer for optimization and tuning

Training

1 week

Operator and maintenance team training

Ongoing Support

12 months

Remote diagnostics and warranty service

Quantified Results

Measurable Outcomes

Performance data verified after system commissioning and sustained operation.

40%
Faster Cycle Time

From 14s to 8s per unit

100%
MES Integration

Real-time production data visibility

0
Manual Data Entry

Automated OEE and quality tracking

30%
Defect Reduction

Station-level traceability and early detection

Before vs After: Quantified Comparison

Metric Before After Change
Cycle time per unit 14 seconds 8 seconds −40%
MES integration Standalone machines, no data 100% real-time MES integration Connected
Manual data entry Paper-based OEE tracking 0 manual entry (automated) −100%
Defect rate Baseline 30% reduction (early detection) −30%
Production visibility End-of-shift summary Real-time OEE dashboards Live

Data based on project commissioning reports and sustained operational measurements. Client name available under NDA.

Bottom Line Impact

The delivered automation system exceeded all performance targets specified in the contract, achieving higher throughput, lower energy consumption, and improved product quality compared to the baseline operation. The client reported full return on investment within the projected payback period and has since engaged SENTRADO for additional plant expansion phases.

Have a Similar Project?